Tuesday, September 28, 2010

evolving flood protection infrastructure


standard levee on higher ground (French Quarter, banks of Mississippi)


Pumping Station (#3, southern end of London Ave. Canal)


concrete flood walls (London Ave. Canal, near Dillard University and at mouth of canal)



USACE Interim Closure Structure (17th St. Outfall Canal at Lake Pontchatrain)



Bonnet Carre Spillway (Mississippi Delta)


0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home